Starting Monday, March 10, 2025, a contractor will repair deteriorated tunnel ceilings at two locations: the tunnel leading to the Athletics Centre and between Nideyinàn and the Architecture Building.
The tunnels will remain accessible to pedestrians and tunnel carts during the repairs. Work areas will be boarded to contain dust and debris. Repairs are expected to take up to five days.
Friday, March 7, 2025 in Campus Life, Faculty, News
Share: Twitter, Facebook